ANNOUNCEMENTS

May 2010

Hydra-Electric designs and sets the stage for a brand new, expanded presence at the 2010 FARNBOROUGH AIRSHOW July 18th. Meet with Sales Managers and Chief Operating Officer for individual meetings at our booth in Hall 3, B-22. Write us at farnborough@hydraelectric.com to reserve a time!

February 2010

Hydra-Electric is pleased to announce the addition of Daniel Price to its talent pool as a Senior Aerospace Design Engineer at its Burbank facility.
Read More >>

January 2010

Bob Guziak, the newest talent to join the ranks at Hydra-Electric, has been appointed to the position of Senior Manager New Products.
Read More >>

September 2009 
Burbank California 

Meeting the rigorous demands of delivering the advanced Airbus A350 commercial airliner, key contractors have signed with Hydra-Electric to provide switches for vital aircraft systems.
Read More >>

July 2009 
Burbank California 

Hydra-Electric launched its remarkable new information web portal at this year's Paris Air Show, June 15-19 at Le Bourget France, in the northern suburbs of Paris.
Read More >> 

November 2008 

Hydra-Electric celebrated its 60th year as the leading manufacturer of temperature, pressure and liquid flow switches to commercial aircraft, defense programs, government projects and aerospace manufacturers around the globe.  
Read More >> 

January 2006

Hydra has completed Safety of Flight testing for the 60H0037T temperature switch procured by Parker Hydraulics System Division. The switch is used for engine temperature monitoring on the Falcon F7X aircraft.

October 2005

Hydra begins production deliveries of the 42H0002D delta P differential pressure switch used on the nitrogen-based fuel inerting system developed by Honeywell and Parker Aerospace. Certification has been achieved for the Boeing 747 aircraft with future Boeing commercial models also under consideration.

October 2005

Hydra completes qualification testing and enters production deliveries of the 83550-2 hydraulic pressure switch. The switch is used on the thrust reverser system developed by Goodrich Actuation Systems and installed on the Bombardier CRJ700 aircraft.

September 2005

Hydra begins deliveries of 2 pressure and 2 temperature switches for monitoring the main and auxiliary gear box transmission on the Dhruv Advanced Light Helicopter. The switches are procured by Hindustan Aeronautics Limited.

June 2005

Hydra has entered qualification testing of the 15H0082PH hydraulic pressure switch used by Smiths Aerospace Mechanical Systems on the Airbus A380 LGERS (Landing Gear Extension Retraction System).

February 2004

Hydra begins production deliveries of the 8H0025-1G low pressure fuel switch procured by the Goodrich Aerostructures Group for use on the CF34-10 nacelle.